The project consists of:
This car park is to be developed on the roof of the existing multi-storey car park P1. A separate direct access point should be developed at the current entrance to car park P1 (level 174,000). This access consists of the construction of a road and a ramp enabling level 180,000 to be achieved. This car park should contain +/-800 places.
It concerns the extension of the car park situated along rue Santos Dumont beyond the vehicle checkpoint, a parcel of land registered or having been registered at Charleroi 23 Div Gosselies C270e. The car park should contain +/-100 places.
It concerns a new car park developed in close proximity to the airport, with a capacity of 982 hydrocarbon materials. This study has also included technical aspects.
Brussels South Charleroi Airport
Bureau d’architecture Greisch
BPC
4,800,000 €