CITE DE LA PAIX – CHAPELLE-LEZ-HERLAIMONT

Construction of 122 public housings

The project consists of 5 apartment buildings in the centre of the town, each of 3 storeys and one underground level.

The first phase of the project has been already executed, which is the construction of a building of 31 apartment units.

The structure is composed of concrete walls or load bearing masonry walls carrying slabs which are cast on panel-decks.

Isolated footings are used for the foundations.

A transfer slab has been used to carry the load bearing walls above the different layout of the structure in the underground level.

Owner

La Ruche Chapelloise

Architect

Bureau d’architecture N&CO

Contractor

Socatra

Cost

14.400.000 €

Phase 1 ended in 2013

Surface

12.400 m²

 