The major objective of the owner is to upgrade the building in a way it will be in conformity with the actual standards for the rental of offices.
The building includes 9 storeys of which one is a technical floor at the roof level, 3 underground levels for parking, technical areas, archives and so on.
The first to the eighth floor are office areas which can be rented independently one of the other.
The technical floor at the top of the building includes the boiler and the generator rooms.
The major structural works are:
Cofinimmo
LD2 Architecture
10 095 700 €
15.400 m²