85 Apartments of which a part is dedicated for public housings.
The high level of the bedrock characterising this region, made the use of shallow footings obvious, simplifying the construction and lowering the cost.
The optimisation of the construction cost pursued by maximising the use of prefabricated elements and of load bearing masonry, reducing the construction time while keeping a high construction quality of the structure.
Foyer de la Haute Sambre (Thuin)
N&CO – Atelier d’architecture Christine Gérard
Lixon
12 000 000 €