FR NL EN

JOSEPHINE CHARLOTTE BUILDING – JAMBES

This complex, built for the Wallonia region, includes 8 floors and 2 underground levels.

The peripheral underground wall has been executed using slurry wall elements.

The superstructure includes concrete slabs carried by flat beams allowing flexibility in the choice of the building services systems.

The top floor is partially in steel.

Owner

Région Wallonne

Architect

Emile Verhaegen

Contractor

Koeckelberg

Cost

14 650 000 €

End of works : 2008

Surface of administrative offices

9.200 m²

 Parking surface

2.200 m²

poly-tech engineering mentions légales
© www.orangebleu.be