Project completed in 2018
BSCA/SOWAER– Parkings – GOSSELIES
Client
BRUSSELS SOUTH CHARLEROI AIRPORT SA
Contractor
BPC
Architect
GREISCH
Project address
8 Rue des Frères Wright, B-6041 Gosselies
Final Accounts
Total
€4,800,000
Description
The car park was developed on the roof of the existing multi-storey P1 car park. A separate direct access was created at the existing entrance to the P1 car park (level 174.00). This access included the construction of a road and a ramp providing access to level 180.00. The car park provides approximately 800 spaces.
Extension of the Staff Car Park
This involved extending the car park located along Rue Santos Dumont, upstream of the vehicle control point. The car park provides approximately 100 spaces.
New P4 “Foot & Fly” Car Park
This involved the construction of a new car park near the airport, with a capacity of 982 spaces. Part of the car park was constructed with an asphalt surface. The study also covered the technical installations and related infrastructure.